Genelite: Powering Brisbane’s Iconic Skyline
1 William Street is not only a feature of the Brisbane skyline but also a critical hub for Queensland’s government operations. At 260 meters tall, it stands as the city’s third-highest building, featuring a modern design. However, beyond its exterior lies a critical system ensuring seamless operations—the building’s backup power solution.
Genelite supplied a robust set of four 1650kVA standby-rated generators, engineered to deliver reliable power during outages. These generators are integral to maintaining essential services, from lighting and elevators to critical government infrastructure. Their performance ensures that even with unexpected power disruptions, 1 William Street can continue to operate without interruption.
Powering Critical Operations
High-rise buildings like 1 William Street demand constant power to support the thousands of workers and systems they house. Power outages can lead to significant disruptions, impacting essential services, safety, and productivity.
Each of the 1650kVA generators is capable of handling substantial electrical loads. Together, they create a reliable, redundant power system designed to minimise risk and maintain continuous operation. This setup ensures that vital functions remain online, supporting the building’s role in the government operations in Queensland.
Looking for reliable power solutions? Contact Genelite today on 1300 305 912 to discover how we can provide reliable, scalable, and efficient backup power for your operation.
Get in Touch